Final construction cleaning
A final construction clean takes place after major work and dust-producing trades are finished. We review the rooms, finish materials and visible residue to create a project-specific scope. The goal is to present the completed space with the cleaning details addressed.
Details to discuss in your bid
- Dust accessible trim, ledges, doors and fixtures
- Detail kitchens and bathrooms
- Clean cabinetry surfaces and interiors when included
- Clean floors using methods suited to their finish
- Review interior glass, tracks, labels and adhesive separately
Schedule the detail clean at the right time
Arrange the final clean when the work is ready for it. Sanding, drilling or cutting after cleaning can introduce new dust. Confirm which appliances and cabinets are installed, whether protective coverings can be removed and what surface-care instructions need to be followed.
Exterior glass, high areas, paint or adhesive removal, floor coatings and debris hauling are not automatically included. Flag these during the bid review. A separate touch-up visit can address light dust or traffic after the final clean.
Request your Auburn or Opelika project bid
Start with the project address, approximate square footage and target dates. Our team will review your needs and follow up about the scope and next steps.